top of page
JORDAN LAKE PROJECT
This Marietta home had a major reconstruction of the upstairs floor plan. A back staircase was demolished in order to add another full size bedroom and a full bath. The kitchen cabinets were professionally painted and re-positioned to create a large nine foot island as well as a coffee/wine bar with beverage fridge. The master bathroom was renovated to include a beautiful free-standing tub and a luxurious shower. We extended the hardwood flooring into the kitchen to flow seamlessly between the entryway, dining room, and living room. New recessed lighting and light fixtures were added throughout the home to make it bright and inviting.
WHAT
Full Home Remodel
WHERE
Marietta, GA
WHEN
Completed November 2022
bottom of page